SMRP metric 1.1 · Revised in the 7th edition
RAV per Craft-Wage Employee (SMRP Metric 1.1)
The short-form equation is RAV / nc. Every symbol is defined in the variable key below.
Dollars of plant replacement value per craft-wage employee. Use replacement value, never book or insured value.
RAV / nc
RAV = replacement asset value · nc = craft-wage headcount (FTE, including contractors used to supplement routine work)
Ex. RAV = $500M, nc = 125 → $4.0M per employee.
Edition note. This metric is listed as revised in the 7th edition of SMRP Best Practices. The formula on this page is the 7th-edition form. The exam may still use earlier wording, so if a question quotes a formula, use the formula in the question. Unconfirmed 6th-edition equations are not shown.
This page is study material for the closed-book CMRP exam. It is not official SMRP text. Learn the short-form equation and the variable key well enough to write them from memory.