Craft worker on shift ratio (SMRP Metric 5.5.6)
The short-form equation is nsh / nc. Every symbol is defined in the variable key below.
What share of the craft workforce is on shift coverage.
nsh / nc
nsh = craft workers assigned to shift · nc = total craft workers. Often shown as a ratio (for example 1:6).
Ex. 8 of 48 craft workers are assigned to shift coverage → 1:6, or 16.7% on shift.
Edition note. This metric is listed as revised in the 7th edition of SMRP Best Practices. The formula on this page is the 7th-edition form. The exam may still use earlier wording, so if a question quotes a formula, use the formula in the question. Unconfirmed 6th-edition equations are not shown.
This page is study material for the closed-book CMRP exam. It is not official SMRP text. Learn the short-form equation and the variable key well enough to write them from memory.
Practice this metric in exam-style questions
The free diagnostic and the $99 practice-exam pack include original calculation and definition items. They are not official exam questions.
Independent exam prep · Not affiliated with SMRP